from 24 February 2014 to 1 March 2014
Asia/Novosibirsk timezone
Home > Timetable > Session details > Contribution details

Contribution Oral presentation

Trigger, electronics and DAQ

Upgrade of trigger and DAQ for CsI at BelleII


  • Vladimir ZHULANOV

Primary authors

Abstract content

The upgrade of the Belle detector (BelleII) is going on now. This upgrade is needed to operate on high luminosity of the KEKB storage ring after its upgrade (SuperKEKB) and concludes redesign of the most subdetectors, front-end electronics, Trigger and DAQ systems. In this report we present the modified trigger subsystem of the CsI calorimeter and its integration with Global Decision Logic of the BelleII detector. We also mention the data processing in the CsI calorimeter front-end electronics and its integration with BelleII DAQ system.