BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//CERN//INDICO//EN
BEGIN:VEVENT
SUMMARY:The Phase-1 Upgrade of the CMS Pixel Detector
DTSTART;VALUE=DATE-TIME:20170228T080000Z
DTEND;VALUE=DATE-TIME:20170228T082000Z
DTSTAMP;VALUE=DATE-TIME:20261118T180003Z
UID:indico-contribution-1736@indico.inp.nsk.su
DESCRIPTION:Speakers: Martin Lipinski (1. Physikalisches Institut B\, RWTH
  Aachen)\nThe CMS experiment features as its innermost component a silicon
  pixel detector which provides high precision space point measurements of 
 charged particle trajectories. The original detector was designed for an i
 nstantaneous luminosity of $1.0 x 10^{34} cm^{-2} s^{-1}$. Due to improvem
 ents of the LHC this luminosity was already exceeded in 2016 and it is for
 eseen that it will be further increased up to two times the design value b
 efore 2018. This will lead to more interactions per bunch crossing and als
 o the inefficiencies caused by the readout electronics will rise.\n\nTo ma
 intain the excellent tracking efficiency\, the CMS collaboration has built
  a new pixel detector with the plan to install it in an extended technical
  shutdown at the beginning of 2017. The Phase I pixel detector features an
  additional fourth layer in the barrel part and an additional third layer 
 in the endcaps. The material budget could still be reduced by a lightweigh
 t carbon fiber support structure and a new cooling system using a two-phas
 e CO2 cooling. To reduce data losses\, new readout chips with larger buffe
 rs and a digital readout have been developed and the readout electronics w
 as upgraded. Furthermore the new detector features a novel powering scheme
  using DC-DC converters.\n\nThis contribution will motivate the design cho
 ices for the new pixel detector and their impact on the tracking performan
 ce. With a special focus on the barrel detector\, the production and quali
 fication of pixel modules and the power system components will be discusse
 d and final results will be presented. The results of system tests that we
 re carried out with the DC-DC power system will be shown. The status of th
 e mounting of components onto the support structures\, the associated test
  procedures including results\, and the status of the installation of the 
 whole detector into CMS will be discussed.\n\nhttps://indico.inp.nsk.su/ev
 ent/8/contributions/1736/
LOCATION:
URL:https://indico.inp.nsk.su/event/8/contributions/1736/
END:VEVENT
END:VCALENDAR
