Description
China Spallation Neutron Source (CSNS) accelerator complex consists of a front end, an 80MeV DTL LINAC, and a 1.6GeV Rapid Cycling Synchrotron (RCS). It is designed with a beam power of 100kW in the first phase and reserves upgrade capability to 500kW in the second phase. CSNS has started user operation at 20kW after the initial beam commissioning in 2018, the beam power is quickly up to 50kW and 80kW by two times beam commissioning in between the user beam time 2019, and finally reached 100kW, the design goal, in February 2020. This talk gives the experiences and most recent status of beam instrumentation system of CSNS during the beam power ramping.